THE CHAMBER
WORK
January
10,2012
Very productive 3+ hour work
party tonight.
+ The narrow opening on top of
the swell
shades was insulated and enclosed.
+ Chris and Wayne installed the
swell shade
motor and all the mechanisms (linkages, springs, etc.) that allow them
to operate.
+ Dick and Wayne evaluated the
condition of
the regulators and discussed needed repairs, as well as how they will
be configured in the chamber.
+ Dick walked Wayne through the
work that
needs done (adjusting primaries, etc.) on all the magnet boards for the
main and solo chests before wiring can be done. A work schedule will be
worked out.
+ The toe boards for the main
chest were
hauled up to chamber level where they will be readied for installation
after the magnet board work is done.
Some photos attached.
- Ken